Comprehensive Plan

Print
Press Enter to show all options, press Tab go to next option

Download Full Plan

By Section

Maps Only

C3 Plan Objectives:

  • Remove outdated and irrelevant information
  • Remove objectives that have been achieved since the previous plan
  • Update information and demographics
  • Incorporate current policies and objectives
  • Consolidate studies and plans that have been prepared since the 2020 Vision Plan was adopted
  • Distill the existing binder of planning documents into a more succinct and simple document
  • Introduce language to address the trend towards redevelopment
  • Introduce language to address the trend toward sustainability
  • Freshen the content to more accurately reflect the City’s planning vision for its planning jurisdiction

The plan has been given the name Carmel Clay Comprehensive Plan (C3 Plan) because it assembles the crucial elements of each of the existing, independent plans and studies relating to comprehensive planning. Specifically, the C3 Plan consolidates information and plan elements from the following previously adopted documents:

  • Carmel’s 2020 Vision Plan
  • Development Plan and Strategies, U.S. 31 Corridor
  • 96th Street Corridor Study
  • Old Meridian Task Force Report
  • Integrated Economic Development Plan
  • Amended Redevelopment Plan
  • Interim Report for INDOT U.S. 31 Improvements 

Should you have questions, please contact Adrienne Keeling at akeeling@carmel.in.gov

 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer